Secondly it was a lousy day, weatherwise, at CRC on Wednesday, but the team such as it was did move on ahead.
We can show you two pictures of the first post now in the ground and bolted up.
Some of the Team were delayed by attending a Personal Track Safety Course first thing, but the two pictures above show how the post and its base were on arrival late morning on Wednesday.
It was too wet to grout the base for post 1 on Wednesday, so most of the time was taken up with removing the template for post 2 and tidying up the bolts for same.
This picture shows the foundation ready for fitting post 2, hopefully next week.
Last week the team also finished lifting and re-laying the slabs under the second bench to avoid the ponding problem. You can see the bench in its slightly higher position in the picture above.
Finally the
Team did further preparatory work enlarging the holes and sorting out
the levels for the first two fence posts which will go in towards the
platform. They also had a good tidy up and loaded up a lot of spoil to
take back to Winchcombe.
This picture shows the team in action: Austen,
Rob, Jim M, and Pete, with Jim H behind the camera.
On Thursday members of the C&M team are off to Tyseley to load the large blue bricks that we have purchased. These would be suitable for topping off the pit of the turntable that is planned. We should be able to show a picture of that little operation in next week's blog post.