Monday, 6 June 2016

Site meeting at Hayles

A site meeting was held today by Jim, the project leader, to introduce those who have put their names forward to come and help. Another will be held on Friday, for those that can't do Monday. The working days will be the two non running days, Monday and Friday, always in liaison with the ops manager.

Today was one of the non-running days. Here Jim is explaining the structure of the platform wall, which will be made of the concrete blocks you can see, faced trackside by wooden beams which will give it the look of being constructed in wood. There will be the usual corbelling of imperial blues, and then some of the remaining platform slabs ex CRC2. A supply of rebar was also delivered. We have access to a generator, and an SDS drill.

A mixer and barrows are now on site, a friendly gesture of the Broadway gang. We could do with some shovels still, and some plastic chairs or a scaffolding board to make a bench - we have to have our tea somewhere!

As this was a site meeting, we stayed topside. We did have the chance to position the water tank, and this will be filled periodically from a friendly neighbour nearby. The reopening of the halt certainly seems to have neighbour report.

It looks now as if the first working day will be Monday or Friday next week, depending on what is most popular after the second site meeting.

Another site visitor was this Hercules. We appear to be in a designated low flying area, which explains the regular Hercules and Chinook low flying traffic over your blogger's house in the valley. This one flew round Dumbleton Hill several times. It's always very impressive when they suddenly appear overhead. There was also a report of 3 B52s in the area - one was seen over Pershore - but none ventured over Hayles today. Now, that would have been quite something.

Near to Hayles Abbey halt is a fruit farm, and the owner is one of our supporters. He explained that he used Hayles Abbey halt when it was open (prior to March 1960) in his schooldays. There was an early morning train with a couple of carriages and about 30 regulars on board. He would cycle down to the halt, padlock his bike to the railings and take the train down to Cheltenham Malvern road, together with other schoolchildren along the line. (we have heard similar stories from older residents of Broadway). The train would then continue to St. James.

The fruit farm felt that a re-opened halt would benefit their customers, many of which camp in the grounds, so they were quite for it.

More news will be posted when work starts.

Saturday, 21 May 2016

A tidy up, and storage at Winchcombe

On Wednesday the B&S gang were busy at Winchcombe.

First of all, they sorted out all their edging slabs, wall top blocks, bricks of all sizes and concrete blocks into piles and then put them on to pallets, or into stillages. This will make it much easier to find a particular piece of building material when you need it. It's amazing the different sorts of material that there are.

Here is the area round the back of the B&S shed, now looking very tidy. During the clear out, it produced about 4 tons of rubble, and a pile of rotten pallets, all of which was disposed of.

Now, if you need a 3 inch blue, you can go straight to it. Or a 2 7/8ths inch model, B&S can help you!

Our last report showed the gang at Toddington, where a concrete base was put down for a weather proof cover for the admin office. Since that report, the gang has produced all the necessary components in kit form, and a start will shortly be made on assembling it in situ, if the weather allows it.

The other job at Winchcombe was the construction of two sand and gravel boxes next to the B&S shed. It struck the gang that the drainage gang, also based at Winchcombe, was using the same sand and gravel as B&S, but from different sites in the yard. This meant two piles of everything, and two sites. The brainwave was to combine the two in one neat storage area, an idea which will reduce the overall cost of sand and gravel due to buying in bulk, and make ordering much more efficient. Space is also saved, as the boxes are shared.

In this picture the component parts of the two boxes are being sorted out, ready for assembly. The materials used are cheap - some off cuts of H section steel, a few left over old crossing pads, and second hand sleepers. Very economical, but with good effect.

In the background is the new C&W extension, and, interestingly, a bracket signal lying on its side. Wonder where that is due to go?

One end of the boxes needed an additional support, which was welded on at ground level. Could be a neater weld, but hey, it's only got a job to do, so it's fine.

Finally, the finished product:


Didn't they do well? A few more sleepers that need inserting, and we're ready for the first order of sand and ballast.

No news on Hayles Abbey halt this week, due to holidays of key players. Back soon, then we should make a start on block laying.

Friday, 13 May 2016

Hayles update

Just a short update to say that preparations continue behind the scenes in order to make a start on the platform wall.

The delay experienced was caused by sourcing issues (which supplier is the cheapest) but has now been resolved in favour of the original intended supplier, who has quoted a very attractive price indeed. We hope to have a delivery shortly. There is also a secure container on site. A source for a mixer and two barrows has also been found. So it looks as if we should be able to start work as soon as we have the materials.

We reported earlier that a member has offered a GWR corrugated iron shelter of the same type as originally at Hayles Abbey halt. We reported that this came from Fosse Cross, but the kind donor has now pointed out that he has two such shelters in his garden (who knew?) and while he did indeed recently recover one from Fosse Cross, it is the other one from Usk that we are getting. Arthur 'two sheds' Jackson springs to mind....

Your blogger was able to inspect both for our readers. The Usk one is 100% GWR and has an angle iron frame. The Fosse Cross example is also clad in corrugated iron, but has a wooden frame, being M&SWJR. Therein lie the subtle differences. No stone is left unturned to make Hayles Abbey halt as real as possible!

On the B&S side the gang has certainly not sat on its hands, but the issue here is the finding of people able to photograph the activity. Ideally we would like to report weekly, but this has not proved possible in practice due to the absence of photographs. We hope to make a new report next week though.

In the meantime, you might enjoy these two photographs of P&O, taken during one of the test runs on a non-running day:

Emptying the ash pan at Toddington, prior to departure for Laverton.


P&O passes under the road bridge at Stanton on a test run to verify the speedometer




Thursday, 21 April 2016

New jobs

The B&S team doesn't stand still, and yesterday found them at work in two different locations at once.

The first was here, outside the development office at Toddington. It's here where the postman is eagerly awaited every day, in the hope that blog readers are sending their cheques for the Last Mile share issue. We're about a third of the way there at the moment.

The admin offices are housed in a group of Portacabins at Toddington. The main door faces into the prevailing wind, and as a result it often jams when swollen due to water ingress. In the picture, the B&S team are removing the slabs that gave access to the door. They are going to be repositioned nearer to the camera, so that an awning can be built to shelter the door and visitors from the rain, with a new access from the side facing the camera, away from the wind.





This picture was taken a little later, and shows how the slabs lifted earlier are being relaid to allow access from the side.








At the end of the day - hey presto ! The path is relaid, with a little concrete slope at the end, end the flower pots neatly replaced. You'd never notice that it was any different.

Now to build the awning.







At Winchcombe, a second B&S job was to lay an area of anti slip self adhesive sheeting into the corner of the footbridge.

Pat, dressed in overalls and a Hi Viz vest, was having a bit of a struggle with the roll of sheeting, which had a mind of its own and was very sticky. Stationmaster Phil, dressed in all his stationmaster's finery, was too much of a gentleman to just stand and watch this. He got down on his hands and knees to help.

This was the result a few minutes later - neat, or what?

Looking over the top of the footbridge, we get a quick snapshot of the new platform extension now in service. The rear wall has had an extra row of bricks put on to manage the flower bed behind it. An additional lamp post, of GWR pattern, will be ordered as part of the order of 10 for Broadway. The pattern for this is expected to be ready this month. The copper top has been ordered form a separate source, also as part of the Broadway order. We are working together!

Does anyone else need a GWR platform lamp post?


Hayles Abbey update.
The site is now fully set up with water bowser and ISO container. We are now awaiting delivery of our first building materials. Once these are on site, construction of the platform can begin. We will keep you posted of progress.



Friday, 18 March 2016

Away at the races

It's only 3.5 degrees, to cold for any block laying. There's an icy wind blowing from the north.

But hey, there are Race Trains !

Smoke curling from the signal box stove pipe, and a distant whistle, had yours truly racing for platform 2. The first had already gone, but the second was right behind.

Dinmore Manor coasted into the station, slowing to pick up the new token from the signalman.


With the token safely on board, time to open the regulator again. They're not stopping here, it's a special.

This gives us the unusual view of a train under power accelerating through Winchcombe.

This shot was almost spoiled by a phenomenon well known to the railway photographer. You set up your shot, no one's about, it's a perfect scene. Nothing can go wrong now. Then, at the very last minute, the unpredictable arrives - a man with a lawnmower emerges on the opposite platform! Argggggghhhhh!

Lawnmowerman is safely hidden behind the loco...

... which powers away towards Greet tunnel. A fantastic moment, shared with a large number of happy race goers in a packed train. Nearly every table had a bottle of champagne on it, well done those roving Champagne sellers!

No news on the Hayles Abbey front this week. We are waiting for the site container to be delivered. The track has been tamped, so we are ready to start.


Sunday, 13 March 2016

Tarmac at Winchcombe

The platform extension was finished on Saturday with a nice top coat of Tarmac. An attempt planned for Wednesday had to be abandoned due to a technical problem, and the very cold weather.







GWR 5542 was in operation today, and we took the opportunity to show off the new platform surface together with the train returning from Cheltenham. What a lovely scene in the sunshine, cold but bright!

The new platform extension was immediately in use, as a passenger wandered up, and then down it! At the end he found the reinstated GWR trespass notice attached to a length of rail. Still left to do are the completion of the block wall to retain the lawned slope up the back of the old stationmaster's house, and the planting of one more lamp post. This is on order, as part of the larger order to the foundry from Broadway.

As today was a mixed traction day, we will not withhold from you another view of the newly tarmaced platform, this time with the 3 car DMU just heading off for CRC. It fits in very nicely.


At the other end of the station the barrow crossing was also finished yesterday, thanks to help from Andy and Stuart from lineside drainage gang. A picture of that work appears on their Flickr site: https://www.flickr.com/photos/gwr-lineside-drainage-management/

Next week the B&S gang will be starting on repairing the footbridge surfaces. Some reorganisation of the C&W yard is also taking place. The picture below shows the progress already made.

Accumulated debris has been cleared from in front of the stock in the three isolated sidings visible in the middle top of the picture, and the pile of CRC2 slabs by the gate will also be relocated, some of which to Hayles Abbey Halt for use on the new platform there. This yard will look a lot roomier and neater soon.

Further work at Hayles Abbey has been suspended for a short while. The platform will be built off the levels of the track, and with the tamper due in the area very shortly, the team preferred to wait until the track was definitely in the right place and at the right height, before any block laying starts. The tamper has now been, the track is correct, so work should start within the next week or so.

A water tank has been brought to the site, and a site container has been found and is also due to arrive as soon as transport can be arranged.

Wednesday, 2 March 2016

Winchcombe platform progress

A visit to Winchcombe today to chat to C&W about ticket hatches, and FoWS about GWR lamp posts, also allowed a quick look over the fence to see how the new platform extension was getting on.

It's looking pretty good ! All the brickwork and infill is done and compacted. Looks finished then? Not quite.

Another layer of fines is due on top, as a surface on which to lay the final topcoat of tarmac. A conduit also needs to laid along the rear to service a new lamp post, which will be positioned where the slope starts. FoWS have decided to join Broadway in their order of replica GWR posts for this last one. That's great collaboration.

Here's an overall view of the almost finished platform extension. Doesn't it look neat! It's even received a new white line, painted during a brief spell when there was no rain. The slope behind the rear blocks still needs a little infill, to meet up with the top of the blocks.

 Just when you think you're in the low season without any traffic, there a toot, and a train comes along. In this case it's the hired in tamper, back out after lunch to continue where it left off at 13m 53ch. It's nice and warm in that tamper (it was bitterly cold outside today, with temperatures just above freezing, and a strong wind) and the cosy cabs were filled with PWay volunteers ready to follow the tamper's progress and fill the holes left by the tines with ballast. This is relentless, back breaking work, which can stretch for a whole mile in a day if it makes good progress.

The work on the Winchcombe relay is also nearing the end. Today the tamper handled the track between the platforms, and the second PWay gang is filling in irregularities and voids by bringing in fresh ballast on a trolley. This is also back breaking work. At least the trolley is filled with the forklift, and shovelling the stuff in means that you are warm. They replenished their energies in the PWay mess coach on a meal of hot faggots. Well, you've got to look after yourself, haven't you?

Chatting to FoWS produced a peek into the weighbridge house, where this item was discovered. It is a coal scuttle, stamped GWR ! They really put their house style on everything. It was offered for the Broadway signal box, if we want it. We shall confer, it would be a lovely historical item with provenance too. You can just make out a 'G' under the front lip.