Thursday 13 June 2019

Both posts









First a shot in the workshop of Mike painting the frame for a new door made by Barry for the storeroom on P2 at Toddington.





Here is the door painted up.









Again most of the action out on the road was at Cheltenham with a team concreting the holes around the two gate posts. 




















A start was also made on welding four brackets to each of the posts which will support the large and very heavy fence panels which will run outwards from the gates.

The two pictures above show Mike welding the brackets on to one of the fence posts.






Here is the first fence post installed, complete with 4 brackets (in the background, behind the gate post in the foreground)








Post No. 2 with concrete.
Post 1 has shuttering in place and the concrete is being tamped.
 
 
Rob was on tamping duty, and you see him here on post No. 1 and on the right with post No.  2. 

Soon we will be able to hang the actual fencing panels.

Post scriptum:

Three more pictures have become available of the day:





The top one shows the entire team in action at CRC, while the other two show the concrete poured into the feet of the two cast iron posts from Broadway.

1 comment:

  1. looking good! Real level crossing gates required now.
    Regards, Paul.

    ReplyDelete